Scheduling and dispatch

People and machines on the same plan.

In civil engineering, staff are not planned separately from machines – a crew without an excavator is as useless as an excavator without an operator. In BauLane both run on the same plan.

What goes wrong today

Next week’s plan lives in the site manager’s head and gets distributed by phone. If they fall ill, nobody reliably knows who was supposed to go where. And the fact that two sites scheduled the same wheel loader surfaces on Tuesday morning.

Staff and machines together

Both resources are dispatched in the same plan. It becomes visible whether a crew has the matching equipment scheduled with it – rather than finding out on site.

Conflicts surface before the day

A double booking is visible during planning, not at seven in the morning. That moves the correction from the site back to the office, where it costs far less.

The plan is not in one person’s head

Because it lives in the system rather than in someone’s memory, it remains available when exactly that person is out. As parallel sites multiply, this is the point where shouted instructions stop working.

Qualifications are taken into account

Because authorisations are stored on the employee, it is visible during assignment who is even allowed to operate a given machine.

At a glance

  • Staff and machines in one plan
  • Dispatch across multiple sites
  • Double bookings visible during planning
  • Qualifications considered during assignment
  • Plan in the system instead of in one person’s head